Choose Language

Technical guide

Ship Cold Room and Provision Store Systems: Design, Capacity Calculation and Temperature Standards

By Ercan KeskinPublished on 20 September 20269 min read

In brief

  • MLC 2006 Regulation 3.2 requires food store, cold room and galley inspections under the master's supervision at least every 7 days, recorded in the official log book.
  • Preliminary sizing uses Wärtsilä's per-person daily values (chilled ~0.017 m³, frozen ~0.023 m³), plus a 20-30% allowance for packaging and shelf efficiency.
  • Since 1 January 2020, servicing with HFCs of GWP above 2500, such as R-404A, is banned on EU-flagged ships; retrofit to a low-GWP gas such as R-407F.
Contents
  1. 1. Why Are Ship Cold Rooms and Provision Stores Critical?
  2. 2. Temperature Zones and Food Safety Standards
  3. 3. Capacity and Volume Calculation
  4. 4. Insulation and Construction Details
  5. 5. Refrigerant Selection and Regulations
  6. 6. Class Society Approval
  7. 7. Installation Rules
  8. 8. Periodic Maintenance and Inspection
  9. Frequently asked questions

Ship cold room systems (provision stores) are the sub-system that keeps the crew safely fed on voyages lasting weeks or even months, yet they attract far less attention than the galley. In Wärtsilä's definition, provision stores are "refrigerated stores intended to preserve perishable foodstuffs for use on board", and an inadequately designed store means both a food safety risk and an unhappy crew.

A sound cold room project has to address four separate disciplines together: temperature zoning and food safety standards, capacity calculation based on crew size and voyage duration, insulation and construction details, and refrigerant regulations that are being enforced ever more strictly. In this guide we cover these four topics using verifiable sources rather than invented figures.

1. Why Are Ship Cold Rooms and Provision Stores Critical?

A shore-based business calls its supplier when stock runs low. On a ship there is no such option: until the next port call (sometimes 20-30 days, and longer on some cargo routes) the vessel has to manage with the provisions on board. This turns cold room capacity and temperature control into a direct operational necessity.

The consequences of an inadequate or poorly designed cold room system:

  • Food safety risk: Exceeding temperature tolerances (especially for meat, fish and dairy) endangers crew health.
  • Inspection non-conformity: Temperature and hygiene findings in periodic MLC 2006 inspections can lead to a detention or deficiency record during Port State Control.
  • Wasted provisions: Wrong capacity planning either leaves the store too small or enlarges it unnecessarily, wasting valuable below-deck volume.
  • Regulatory non-compliance: Systems using older refrigerants fall outside MARPOL and the EU F-Gas rules, which can cause serious difficulty with maintenance and spare parts supply (see Section 5).

2. Temperature Zones and Food Safety Standards

The reference framework for food storage temperatures on ships is Maritime Labour Convention (MLC 2006) Regulation 3.2 (Food and Catering) and the associated flag state and class guidance. MLC 2006 requires inspections of food stores, cold rooms and the galley under the master's supervision at intervals of no more than 7 days, with the findings recorded in the official log book.

2.1 Chill Zone

Product groupTarget / accepted temperatureNote
General chill cabinet5°C (upper tolerance limit ~7-8°C)MLC 2006 Regulation 3.2 guidance; a deviation of 1-2°C is not considered a significant risk
Fresh fish0-2°CTemperature on receipt
Minced meat / mince-based products2°CTemperature on receipt
Egg products4°CTemperature on receipt
General chilled productsReject if above 7°CAcceptance criterion on receipt

2.2 Freezer Zone

The MLC 2006 guidance defines the freezer temperature as -18°C or colder; short-term deviations to -15°C are considered acceptable. The receipt temperature of frozen products must also be -18°C or below.

2.3 Dry Provision and Vegetable Stores

Not all vegetables and fruit are kept in the cold room; some products (such as bananas, garlic and mature potatoes) should be kept at room temperature. For vegetables and fruit, a "cool room" at up to 10°C is considered sufficient. The dry provision store should be cool (~10°C), dry, well lit and ventilated; goods must never be placed directly on the deck and should be stored on a shelving or grating system.

3. Capacity and Volume Calculation

A commonly used starting point for sizing a cold room is the per-person daily consumption reference values published in Wärtsilä's engineering encyclopedia. These values are used at the preliminary design and quotation stage; the final sizing is settled according to the galley menu, the passenger and crew profile and the voyage route.

3.1 Daily Consumption per Person

Provision typeDaily weightDaily area/volume
Dry provisions~1.5 kg/person~0.06 m² (shelf area)
Chilled~1.4 kg/person~0.017 m³ (volume)
Frozen~1.1 kg/person~0.023 m³ (volume)

Source: Wärtsilä Encyclopedia, "Provision stores". Note: dry provisions are expressed as shelf area (m²), whereas chilled and frozen provisions are expressed as volume (m³); the two must not be confused.

3.2 Worked Example

Using these reference values, the approximate chilled plus frozen store volume required (excluding dry provision area) for different combinations of crew size and voyage duration is calculated as follows:

CrewVoyage durationChilled volume (~)Frozen volume (~)
15 persons14 days15 × 0.017 × 14 ≈ 3.6 m³15 × 0.023 × 14 ≈ 4.8 m³
25 persons30 days25 × 0.017 × 30 ≈ 12.8 m³25 × 0.023 × 30 ≈ 17.3 m³
40 persons45 days40 × 0.017 × 45 ≈ 30.6 m³40 × 0.023 × 45 ≈ 41.4 m³

4. Insulation and Construction Details

Cold room panel thickness is determined by the target temperature difference. The thickness ranges generally accepted in shore-based cold store engineering are as follows:

ZoneTemperature rangeTypical PIR panel thickness
Cool room / ante-room0°C – 8°C75 mm
General chill5°C – 15°C50-75 mm
Standard freezer-18°C – -25°C100 mm
Deep freezer / blast freezer-35°C – -45°C150 mm

Source: general cold store engineering practice (manufacturer guides published for shore-based facilities). It is used as a reference on ship-type projects and is not a single maritime-specific table mandated by class societies.

Additional factors specific to the ship environment:

  • Salt-air corrosion: Preferring stainless steel (AISI 304/316L) cladding on the outer panel surface rather than galvanised sheet extends service life.
  • Ship motion: Panel locking and jointing systems must withstand roll and vibration; standard shore-type locking profiles may prove inadequate in some cases.
  • Proximity to the engine room: If the cold room adjoins the engine room or the galley cooking line, the ambient heat load increases, so panel thickness and compressor capacity must be revised upwards accordingly.

5. Refrigerant Selection and Regulations

Refrigerant selection is no longer just a matter of performance; it is a matter of compliance with international and EU legislation. On a new cold room project, these two regulations must be taken into account:

5.1 MARPOL Annex VI, Regulation 12: Ozone-Depleting Substances

5.2 EU F-Gas Regulation

For EU-flagged ships, for HFC refrigerants with a high global warming potential (GWP):

  • From 1 January 2020, the use for servicing of HFCs with a GWP above 2500 (such as R-404A, R-507 and R-422D) has been prohibited.
  • 2030 target: An overall 79% reduction in HFC use is targeted through progressive quota reductions.
  • For systems exceeding 5 tonnes of CO2 equivalent, periodic leak testing is mandatory.
  • For existing R-404A systems, the recommended route is a retrofit to low-GWP alternatives that cut quota consumption significantly (e.g. R-407F, with ~53% lower quota consumption).

6. Class Society Approval

Refrigeration installations are assessed under the machinery rules of the ship's main class society. At Lloyd's Register, for example, the RMC(LG) notation becomes mandatory when reliquefaction or refrigeration equipment is fitted to the ship, and installation and testing are carried out in accordance with the relevant sections of the LR Rules.

Other class societies such as DNV, Bureau Veritas and Türk Loydu also have equivalent refrigeration installation requirements within their own machinery rules; however, the exact section and article numbers vary according to the class society, the ship type and the size of the installation.

7. Installation Rules

  • Cold room door gaskets should be fitted with heated gasket profiles to prevent freezing in the freezer zone
  • Door hinge and lock systems must withstand ship motion (roll/pitch) and be of the self-closing type
  • Floor insulation should be treated separately so as to prevent heat and moisture transfer to the compartment below
  • The compressor/condenser unit should be positioned as far as possible from the heat load of the galley cooking line
  • Lighting inside the cold room should use vapour-proof fittings
  • The alarm system (temperature deviation, door left open) should send a signal to the galley or the bridge
  • After installation, the class society survey and the initial inspection under MLC 2006 should be planned

8. Periodic Maintenance and Inspection

ItemFrequencyNote
Store/galley inspection under the master's supervisionAt least every 7 daysMLC 2006 Regulation 3.2 requirement; findings recorded in the official log book
Thermometer calibration checkMonthlyVerification with a boiling water / melting ice test
Door gasket and gasket heater checkMonthlyEspecially in the freezer zone
Defrost cycleAs per manufacturer's instructionsPrevents loss of efficiency and capacity
Refrigerant leak testPeriodic (depending on system size)Mandatory for systems above 5 tonnes CO2e under the EU F-Gas Regulation

Related content:
→ Marine Galley Ventilation Systems — Galley ventilation standards and calculations
→ Ship Galley Equipment — Technical details of ranges, ovens and cooking groups
→ Ship Galley, Cold Room and Laundry Solutions — our services page
→ Custom Stainless Steel Fabrication — AISI 316L custom cold room panels and fittings

A Cold Room Solution Tailored to Your Project

Share your crew numbers, voyage profile and current refrigerant situation, and we will design a custom-size cold room / provision store.

Frequently asked questions

Can shore-type cold room units be used on a ship?

Generally not recommended. Shore-type units are not designed for ship motion, salt-air corrosion or the ship's electrical system (440V/60Hz or 380V/50Hz), and they may also give the class society grounds for a non-conformity during the approval process.

How is cold room capacity calculated?

For a preliminary calculation, Wärtsilä's per-person daily reference values (chilled ~0.017 m³, frozen ~0.023 m³) are multiplied by the number of crew or passengers and the voyage duration, then a 20-30% allowance is added for packaging and shelf efficiency. The exact volume is settled using the project's menu and voyage profile.

Is my old R-404A refrigerant system still legal?

Continued operation of the system is not prohibited, but on EU-flagged ships servicing and recharging with this gas has been banned since 1 January 2020. The practical solution is to retrofit to a low-GWP alternative (e.g. R-407F).

How often should the cold room be inspected?

Under MLC 2006 Regulation 3.2, an inspection under the master's supervision must be carried out at least every 7 days, with the findings recorded in the official log book. In addition, thermometer calibration and gasket checks are recommended monthly.

What is needed to order a custom-size cold room?

The number of crew or passengers, the average voyage duration, the galley's technical drawing or an on-site measurement, the ship's electrical system and the class society details are sufficient. If no drawing is available, we carry out an on-site measurement.

EK
Ercan Keskin
Founder of ONLYMARITIME

Ercan Keskin has worked in the maritime sector since 2014: galley design for naval, commercial and yacht projects, technical drawing, purchasing, installation and after-sales service. He founded ONLYMARITIME in 2020. LinkedIn

Send us your drawing or equipment list

Tell us the vessel type, the electrical data and the delivery port, and we will come back to you with a technical and commercial proposal.

Chat on WhatsApp