In brief
- Start from the technical specification: crew numbers, ship class, electrical values (voltage/Hz) and the general arrangement plan decide equipment size and compatibility.
- Position open hobs according to the "cooking against the roll" principle, and build all cooking equipment in AISI 316L stainless steel.
- Size the hood with the heat load formula and capture velocities; fit a Type I hood, wet chemical suppression, gas shut-off valves and automatic dampers.
Contents
- 1. Project Start: Gathering the Basic Data
- 2. Layout Planning and Space Optimisation
- 3. Equipment Selection and Specification
- 4. Refrigeration Group and Storage Systems
- 5. Hood and Ventilation Engineering
- 6. Material Selection and Construction Standards
- 7. Integration and Commissioning
- Frequently asked questions
An engineering guide to the heart of a ship's accommodation spaces, from crew number analysis and SOLAS-compliant hood calculation to roll optimisation and region-specific galley equipment selection.
1. Project Start: Gathering the Basic Data
1.1. Technical Specification Analysis
Professional ship galley design begins with a detailed analysis of the vessel's technical specification document:
| Parameter | Importance | Where to Look in the Document |
|---|---|---|
| Crew Numbers | Calculation of daily meal capacity and equipment size | Accommodation Plan, Crew List |
| Ship Class | Fire safety and structural requirements | Classification Certificate, SOLAS Compliance |
| Electrical Values | Voltage/Hz compatibility of all equipment | Electrical Load Balance, Generator Capacity |
| Deck Plan | Galley location and adjacent compartments | General Arrangement Plan |
2. Layout Planning and Space Optimisation
2.1. Location on Board: Roll and Stability
2.2. Zoning and Workflow Design
1
Provision
Entry
2
Dirty
Area
3
Preparation
4
Cooking
5
Service
6
Dishwashing
| Zone | Function | Key Equipment |
|---|---|---|
| Cold Store | Receipt and storage of raw materials | Refrigerator, deep freezer |
| Dirty Area | Vegetable washing, thawing meat | Sink, waste disposer |
| Preparation | Chopping, marinating | Work table, knife steriliser |
| Hot Line | Cooking operations | Hob, oven, fryer |
| Service | Plating and presentation | Bain-marie, plate warmer |
3. Equipment Selection and Specification
| Ship Region | Required Equipment | Rationale |
|---|---|---|
| Far East | Wok ranges, steamers, rice cookers | High heat, fast cooking |
| Mediterranean | Convection ovens, grills, dough processing | Wide variety of cooking techniques |
| Northern Europe | Industrial boiling pans, ovens | Heavy winter meals |
| Global Trade | Modular combi ovens, induction hobs | Flexibility and energy efficiency |
4. Refrigeration Group and Storage Systems
| Component | Function | Temperature Range |
|---|---|---|
| Refrigerators (Reach-in) | Items in daily use | +2°C / +4°C |
| Deep Freezers | Long-term storage | -18°C / -22°C |
| Cold Rooms (Walk-in) | Large-volume provisions | +2°C / +8°C |
| Blast Chiller | Rapid cooling (HACCP) | From +90°C to +3°C in 90 min |
5. Hood and Ventilation Engineering
Total Heat Load Calculation:
Q_total = Q_appliance + Q_lights + Q_occupancy + Q_ventilation
Equipment Heat Load:
Q_appliance = Σ(P_i × U_i × F_i × R_i)
P_i = Appliance rated power (kW) | U_i = Usage factor (0.3-0.7) | F_i = Radiation factor (0.3-0.5) | R_i = Load factor (0.8-1.0)
| Parameter | Value | Standard |
|---|---|---|
| Capture Velocity (Wall type) | 100-150 fpm | VDI 2052 |
| Capture Velocity (Island type) | 150-200 fpm | VDI 2052 |
| Minimum Flow Rate (Wall) | 400 CFM/linear ft | ASHRAE |
| Minimum Flow Rate (Island) | 600 CFM/linear ft | ASHRAE |
| Air Change Rate (Galley) | 30-40 ACH | ISO 9943 |
6. Material Selection and Construction Standards
| Component | Standard Material | Reason |
|---|---|---|
| Worktops and Surfaces | AISI 316L Stainless Steel | Resistance to salt-air corrosion |
| Floor Covering | R13 Non-Slip Marine Vinyl | Friction against oil and water |
| Cabinets | Aluminium or 316L Steel | Balance of lightness and durability |
| Joints | Welded or Sealed with Gaskets | Prevention of water leakage and mould |
7. Integration and Commissioning
- Basic Design: Approval of the ship specification and general arrangement plan
- Detail Design: 3D modelling, clash detection
- Fabrication: Production at the shipyard or at a specialist manufacturer
- Installation: Integration into the ship at the outfitting stage
- Commissioning: Testing of all systems and crew training
Professional Ship Galley Solutions
At ONLYMARITIME, we provide turnkey ship galley outfitting, from technical specification analysis to SOLAS-compliant commissioning. Active in the maritime sector since 2014, we design your vessel's accommodation spaces to the highest standards.
Frequently asked questions
What is the most critical mistake in ship galley design?
Electrical incompatibility of equipment and a layout that ignores the direction of roll. Unlike shore kitchens, ship galley equipment must withstand constant vibration and rolling motion. If the "cooking against the roll" principle is also ignored, crew safety is put at serious risk.
How is the hood calculated?
According to the VDI 2052 and ISO 9943 standards, the formula Q_hood = V_capture × A_hood × 60 is used. A flow rate of at least 400 CFM per linear foot is required for wall-type hoods and 600 CFM per linear foot for island-type hoods. Capture velocity should be 100-150 fpm for wall type and 150-200 fpm for island type.
Which stainless steel grade should be used?
Definitely AISI 316L (low carbon). Grade 304 corrodes rapidly in the marine environment through the effect of chlorides. With its 2-3% molybdenum content, 316L is 40% more durable than 304 in salty air and high humidity. All surfaces should be seamless.
What should be considered in refrigeration system calculations?
Refrigeration capacity is calculated from the sum of the product heat load, infiltration (air leakage), lighting heat, personnel heat and motor heat. In ship galleys, vibration-damping shelving systems and 100 mm or more of polyurethane insulation are essential. Thermal-break profiles should be used at door thresholds.
